Builder wakes me up to explain why an arch in the entryway won’t work as he’s explaining to a framer how to fix ceiling error above stairs (yikes).

Study plans all morning to prepare for meeting with electrician (walk through the house a thousand times turning on and off lights/plugging things in in my head).

Memo to light fixture guy that we need 4 cans AND light kit in study… still need to pick out guest bath, girls bath light fixtures as well as sconces going up the stairs.

Make sure the sole plate is attached to the slab with anchor bolts (of course our builder is on top of all of this, just need to confirm so I’ll know without a doubt in my mind how he did it).

Get 15 pages of cabinet design prints to proof and approve for Tuesday meeting with cabinet guy before he starts cutting the wood.  Heights, depths, widths, how many, what type of wood, what type of trim, molding, and where…

Note to self – we need eyeball cans in living room and master hallway, go over niche heights one more time, Noelle’s closet door to open to inside, both outlets need to be down in laundry room (changed my mind)…

Look through BMC West magazine and pick out stair components – Newels, metal balusters, base color, handrail, and starting fitting

Obtain EXACT TV dimensions, speaker dimensions, and all the box components for built-in shelves in living room (none of which we have bought yet).  Work with Mike on this until after midnight.

Think of several things I forgot to put on my list from today as I’m feeding Anna Kate, too tired to go write any of them down.  Pray for all this hard work to pay off in the end.

Go to sleep.

Give in and wake up at 5AM to write down said forgot things from yesterday because every time I awakened in the night I was practicing memorization techniques to try to remember everything until morning came so I never really could get to sleep.

It’s not so much peaches and cream right now, but we’ll make it!  :)